Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Seedling tray Seedling tray thermal forming machine
Extruder
Houses the screw and barrel where the plastic is melted and homogenized.
Different design for different process material, extruder have high output and good plasticity.
PLC touch screen control.
|
Sheet extrusion mould
Shapes the molten plastic into a flat sheet; mould design is crucial for product quality.
Three rollor calender
Alloy steel 42CrMo, made out of crackless stainless tube, quenching, hardening and tempering treated, its surface is Chrome plated and then polished
|
Haul off unit
Pulls the sheet through the line at a controlled speed.
Harden aluminum, oxidative and half mirror polished treatment.
|
Winder
Rolls the sheet onto spools.
Changing the rolls becomes a simple matter.
|
Model
|
-PC-90-C
|
-PC-100-C
|
-PC-105-C
|
-PC-110-C
|
-PC-115-C
|
-PC-120-C
|
Raw Material
|
PP/PS/HOPS/PE/PMMA/PVC
|
|||||
Sheet Thickness
|
0.3-2mm
|
|||||
Layer
|
1
|
|||||
Extrusion Capacity
|
100kg/h
|
150kg/h
|
175kg/h
|
200kg/h
|
225kg/h
|
250kg/h
|
Screw Dia
|
Φ90mm
|
Φ100mm
|
Φ105mm
|
Φ110mm
|
Φ115mm
|
Φ120mm
|
L/D Ratio Roller Dia
|
Φ300mm
|
Φ320mm
|
Φ350mm
|
Φ350mm
|
Φ400mm
|
Φ450mm
|
Main Motor
|
37kw
|
45kw
|
45kw
|
55kw
|
75kw
|
90kw
|
Power Overall
|
90kw
|
100kw
|
110kw
|
120kw
|
135kw
|
160kw
|
Weight(T)
|
5.5
|
6
|
6.5
|
7
|
7.5
|
8
|
Power Supply
|
380V/50HZ Three phase four wires
|
* Quantity/Quality Discrepancy to destination port during transportation:
In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.